Sb1 Spray Booth

  • Entry Level Spray Booth
  • IMG_1673.jpg
  • IMG_1675-1.jpg
  • IMG_1678.jpg
  • IMG_1680.jpg
  • IMG_1674.jpg
  • IMG_3392.jpg
  • IMG_3393.jpg
  • IMG_3396-rotated-1.jpg
  • IMG_3397.jpg
  • instruction1.doc.jpg
  • instruction2.doc.jpg
  • instruction3.doc.jpg
  • instruction4.doc.jpg
  • IRA-R3.jpg
  • Entry Level Spray Booth
  • IMG_1673.jpg
  • IMG_1675-1.jpg
  • IMG_1678.jpg
  • IMG_1680.jpg
  • IMG_1674.jpg
  • IMG_3392.jpg
  • IMG_3393.jpg
  • IMG_3396-rotated-1.jpg
  • IMG_3397.jpg
  • instruction1.doc.jpg
  • instruction2.doc.jpg
  • instruction3.doc.jpg
  • instruction4.doc.jpg
  • IRA-R3.jpg

Description

SB1 Spray booth

External size (m):  8.1x4.0x3.2 Internal size (m): 6.9x3.9x2.7 Fan capacity(m3/h): 17000 Exhaust fan installed behind booth   read more
Continue Shopping

Price

Quantity

- +

Total

HOT SALE

Description

Spray Booth Sb1 specifications

SB1

ProductTypeDescription
Sb1Entry LevelSpray Booth
ModelNumberSb1
External SizeMeters8.1 x 4.0 x 3.2(m)
Internal Sizemeters6.9 x 3.9 x 2.7(m)h
Wall panelColourWhite
MaterialEPS, Thickness: 50mm
Steel0.6mm with metal edge cover
Front doorEnter Size3 ⅹ 2.66 ( m)
Structure 3 folded sheet metal process
ColorBlue
Front PanelFront White (Front horizontal panel and front vertical panels)
Safe DoorSizetwo pcs safe doors. 1 pc in the front door and the other at the side
Personnel DoorLockPressure Lock
Light SystemTop Led System( 2 )sides x(6)sets x (3 )pcs(40)W/ piece
Side Lights No
Generator Intake(air entering from the roof directly)
exhaust fanat back , ( 1 set of 5.5 kw)
Fan Capacity ( 18000 ) M3/h
Exhaust Ducting With 2 m straight duct,1 pcs 90°bend,1pcs60°bend
Motor Voltage380V/50HZ/3PH
Generator Control Box Direct Start 30amp Min Breaker size then steps down to about 14 amps
Total Power3ph( 7 ) kw
CeilingCover with 50mm EPS panel, enter with filter at the front of the ceiling
Basement Concrete basement ,made by user or direct onto cement floor
Ventilation SystemTop filter (2 pcs/set) Supplied with Booth
Exhaust at Back Exhaust at the down side of the back wall, with paint arrestor filter

Terms and Conditions

Terms and Conditions

Spray Booth
Terms & Conditions
Additional ducting will be for the buyers account
V.A.T.: The quoted price excludes Vat
Warranty: One Year
Training: Training on site is included. If Applicable.
Installation & Commissioning: Installation and Commissioning is included however the connection
of air hoses, water traps, electricity, roof sealing around the ducting, any extension of ducting and a forklift to offload, scaffolding And is for the clients account.
Scope of Work
Scope of Works Concerning the Supply & Installation of Spray Booth and Paint mixing Room
Customer Responsibilities
Fire Prevention/Safety
1. It is your responsibility as owner/user to ensure that all spray painting equipment purchased and installed in your work premises adheres to ALL fire rules, regulations and laws and By Laws etc. Fire rules, regulations and laws etc. differ from municipality to municipality, and it is your responsibility to ensure adherence thereto. Not with holding that we will offer assistance in acquiring approval from the council. You as the Buyer with the aid of Nutec needs to arrange procurement of all necessary authorization and planning permission associated with supply and erection of items quoted herein.
Before Installation: The Buyers responsibility
1. All arrangements connected with civil works to ensure smooth execution of installation, based on drawings supplied by us, if the latter is necessary.
2. Procurement of all necessary authorization and planning permission associated with supply and erection of items quoted herein.
3. Provision of energy supply and energy e.g. oil tank, Diesel Tank (if necessary, intermediate pumps) and supply lines of energy material to our connection points. i.e three phase electricity
4. Electrical supply to switching installation site.
5. Unloading ALL components from transportation at installation site or unless the seller has made prior arrangements with the installers.
6. Supply a forklift truck in able to offloads the products on arrival at the installation site.
7. Access around all plant at point of installation.
8. Room for access to, lying out of and erecting all ventilation and exhaust air.
9. Provision of a forklift for unloading, reloading, if necessary and material handling on site.
10. To ensure sufficient room around each item for installation (approximately 1 meter),
11. The completion of all civil works including pits, Flat floors, platforms etc.
12. Power installations
During Installation: The Buyers Responsibility
1. To ensure solid ground lm around all items for installation in order to set a mobile framework. More may be required if a platform and walkway is built.
2. Provision of 220 and 380 volt construction power for welding and installation equipment and to ensure that there is sufficient cable around each item for installation.
3. Hoisting equipment, Scissor lift (Roof) and scaffolding if needed.
4. Labour, to assist with installation if needed.
5. Power installations with connections to control cabinet and all other consuming devices, such as motors, burner, regulation devices and illumination.
6. Connection of oil and gas burners to supply mains.
7. Roof space for all ducting.
8. The provision of all ducting (Unless otherwise specified) in excess of 2 meters per exhaust from start of the ducting base of any equipment supplied by us. Additionally, the provision of any ducting that deviates, in any way, shape or form from straight
9. Outlet lines ducting for condensation from air heater and smoke/fume line (ducting) as necessary. Waste disposal of condensate in accordance with environmental requirements/regulations.
10. Electrical earthing of all equipment as requested and advised by Electrical engineer.
11. Insulation of warm air ducting and pipes in accordance with the spec.
12. Cable adjusters/anchors for pipes and channels over the roof as necessary.
13. Roof works for fresh air, exhaust air and smoke ducting.
14. Any changes required by the buyer or the local authority in any respect or form will be at the buyers expense
After Installation: The Buyer only if applicable with the purchase or the product.
1. The Buyer will provide heating fuel for commissioning.
2. Making compressed air available.
3. All power hook up by certified personnel.
4. If necessary, inspection and certification from the proper authorities.

 

Reviews (1)

1 review for Sb1 Spray Booth

Quality

100 %

Price

100 %

Service

100 %

Reviewed by 01 customer(s)

Sort by

  • Avatar

    Anonymous

    Great Quality

    Happy with the installation at CA Muller Wellingtton

    14/04/2022

    Share on

    Helpful?

Leave feedback about this

Your email address will not be published.

Quality
Price
Service

Enquiry

Name
Email
Suburb
City
Phone
Enquiry

In Case You Missed it.............

Spray Booths & Car Lifts Suppliers